Insert and Design Tab

The INSERT tab allows you to add tables, slicers, pictures, and sparklines.

SpreadJS Designer displays the INSERT tab with commands for adding tables, slicers, pictures, sparklines, and other worksheet UI elements.

The DESIGN tab is displayed after adding an object from the INSERT tab and allows you to set colors and styles.

Sparkline Design

The following image shows the design tab after adding the area, scatter sparkline types, or a line, column, or winloss sparkline that does not use a formula.

SpreadJS Designer displays Sparkline Design commands for area, scatter, and non-formula line, column, or winloss sparklines in worksheet cells.

The following image shows the design tab after adding a line, column, or winloss sparkline that uses a formula.

SpreadJS Designer displays the Sparkline Design tab for formatting line, column, or winloss sparklines created through worksheet formulas.

Shape Design

The following image shows the design tab after adding a shape.

SpreadJS Designer displays the Shape Design tab with commands for customizing the appearance and layout of a selected worksheet shape.

Picture Design

The following image shows the design tab after adding a picture.

SpreadJS Designer displays the Picture Design tab with formatting and arrangement commands for a selected picture in the worksheet

Table Design

The following image shows the design tab after adding a table.

SpreadJS Designer displays the Table Design tab with style and configuration commands for a selected worksheet table and its data range.

The following image shows the Options tab. This tab is available after adding a table and then a slicer.

SpreadJS Designer displays the Options tab for configuring a slicer connected to a worksheet table for interactive data filtering.

Pivot Table Design

The following image shows the design tab after adding a pivot table.

SpreadJS Designer displays the Pivot Table Design tab with layout and style commands for presenting summarized worksheet data.

Chart Design

The following image shows the design tab after adding a chart. This tab is available after selecting data in the chart and then adding a chart.

SpreadJS Designer displays the Chart Design tab after chart creation, providing commands for changing its type, source data, layout, and style.

TableSheet Design

The following image shows the design tab after adding a TableSheet.

SpreadJS Designer displays the TableSheet Design tab with commands for configuring the appearance and behavior of an active TableSheet.

The following image shows the COLUMN SETTING tab. This tab is available after selecting a column header of TableSheet.

SpreadJS Designer displays the COLUMN SETTING tab after selecting a TableSheet column header, enabling column-level field and presentation configuration.

Gantt Chart Design

The following image shows the design tab after adding a Gantt chart.

SpreadJS Designer displays the Gantt Chart Design tab with commands for formatting taskbars, timescale elements, and project schedule presentation.

ReportSheet Design

The following image shows the design tab after adding a ReportSheet.